Projects

Central Campus Road Projects

Facilities Management announced it will begin several road construction projects on central campus in November and December.

November 8-9: resurfacing of the section of Bell Tower Dr. at the west campus entrance alongside Morton Hall to Academic Drive will be done. The side road north of the Science Center (Bldg. 257) will also be resurfaced. Through traffic will be permitted while the projects are being complete, however, drivers should expect delays.

November 10-30: a complete demo and resurface of Bell Tower Dr. on the east side of campus from Central Texas College Drive past the Science Center (Bldg. 257); the affected area will be closed to through traffic. The Technology Center parking lot (Lot J) will be closed. Temporary access to Lot J will be available off of Success Way. Drivers accessing campus from the Clear Creek Dr. entrance must turn left at the three-way stop sign on Central Texas College Drive. Drivers using Bell Tower Dr. off Clear Creek Road by Advent Health should turn left on Loop Road to access campus.

November (TBD): parking lot R1 across from the Anderson Campus Center will be closed for maintenance work.

November (TBD): the section of Bell Tower Dr. in front of the Physical Education Center (Bldg. 545) and Protective Services (Bldg. 541) will be closed for maintenance. Drivers entering campus at from the Clear Creek entrance will be unable to turn left at the three-way stop sign. Drivers entering campus from Bell Tower Dr. off Clear Creek Road by AdventHealth must turn left on Loop Road to access the rest of the campus.

December 1-19: a complete demo and resurface of Success Way; the affected area will be closed to through traffic. Parking at Eagle Hall will not be available during the project. Parking will be available in the adjacent lots, Lot J and E1.